Education / K-12 / Projects

Our acoustical team reviewed the proposed gym addition at PS 188 located at 2815 West 35th Street in Brooklyn, where the students currently use the cafeteria for physical education.

We considered the mechanical systems proposed for the project, which includes three rooftop units, and the noise control requirements to meet SCA standards in occupied spaces served, as well as NYC Noise Code to surrounding residential properties.

The finished gym will be 7,000 square feet, with a full-length high school basketball court and male and female locker rooms. The gym will also be available for use by the community during non-school hours, to help fill the need for recreational space in the neighborhood.

 

Client: SBLM Architects
Project Type: New Construction
Cost: $10,300,000
Size: 7,000 sf
Location: Brooklyn, NY